Coherent Logix : Home
EventsSee us at the following events in 2011... Mar 9-11 | IWCE Convergent Communications Mar 14-17 | JTRS Science and Technology Forum Apr 26-28 | SPIE Defense, Security and Sensing Jun 7-9 | IMS2011 International Microwave Symposium Sep 12-15 | Beyond Phase II SBIR/STTR Technology Showcase October | 4G World December | Wireless Innovation Forum |
CareersLearn more about opportunities at Coherent Logix at our Careers page. Latest NewsReference Designs for Image Processing and Sensor Markets...9.19.2011 | Coherent Logix, the leader in ultra-low power, high performance, C-programmable many-core processors that enable the next generation of software-defined systems, announced today reference designs for advanced signal-processing applications in imaging and sensor markets. These reference designs are suitable for a wide range of high-volume products including smart cameras, 3D sensors, and other computational imaging products needed in commercial, industrial, and military markets. The challenges of providing rapidly configurable and scalable solutions are address by platforms based on the HyperX™ processor. By implementing algorithms and realizing IP in reusable C code, and leveraging the ease of configurability of many cores, the HyperX™ processor enables a low cost, rapid time-to-market solution that is unmatched by conventional ASIC, DSP, and FPGA-based technologies. Redefining RF...12.1.2010 | Coherent Logix demonstrated the rfx1050s low phase noise, wideband 30MHz to 5GHz FRAC-N Synthesizer at the Wireless Innovation Forum in Washington D.C. The rfx1050s is an integrated FRAC‐N RF synthesizer that generates local oscillator (LO) signals for wireless receivers and transmitters. The rfx1050s contains a fully integrated PLL and VCOs, eliminating the need for multiple external VCO modules to cover a frequency range between 30 MHz and 5 GHz. Visit Downloads for a product brochure. Reaching for the stars...
STS-129 began with a flawless take off on November 16, followed by a journey of 171 orbits and 4,490,138 miles. The crew completed 3 space walks, delivered 30,000 lbs. of replacement parts, and installed 2 experiment racks before ending their mission with a picture perfect landing on November 27. We are proud to have been a part of Space Shuttle Atlantis Mission STS-129 to the International Space Station. Congratulations to the crew of STS-129 and NASA for making it look easy. |


11.16.2009 – 11.27.2009 | Space shuttle Atlantis STS-129 mission to the International Space Station with four HyperX™ processors on board.